Optimal Sizing of Low Head Hydropower Plant- A Case Study of Hydropower Project at Head of UCC (Lower) at Bambanwala

M. Mohsin Munir, A. S. Shakir, Noor M. Khan

Abstract


Pakistan is facing serious shortfall of electricity for few decades. Small hydropower projects can alleviate the worsening situation. The sizing of a low head hydropower plant plays a vital role in establishing the feasibility of the project. The plant needs to be optimized for energy produced, efficiencies of the plant components, number of units and its financial/economic parameters. This paper presents a review on the methodologies by which low head hydropower plants are being optimized to get maximum energy output with minimal cost. The study of various researchers is being presented regarding optimal sizing and selection of small hydropower plant components. A brief summary of low head hydropower schemes in Punjab, Pakistan is also presented herein, which are presently under construction. Moreover based upon literature review and methodology adopted for the hydropower schemes in construction stage, using graphical optimization technique, optimal sizing for power site at Upper Chenab Canal Lower (UCCL) at Bambanwala is also presented. In this study a new parameter; inverse incremental energy is employed for selecting optimum flow. Two turbines (Kaplan, pit type) with combined capacity of 3.58MW are found to be optimal for the case study site.

Full Text:

PDF

References


Gielen, D., renewable energy technologies: cost analysis series Irena, 2012. 1(3/5): p. 44.

WAPDA, “hydro potential in Pakistan”. November 2013.

Anagnostopoulos, J.S. and D.E. Papantonis, Optimal sizing of a run-of-river small hydropower plant. Energy Conversion and Management, 2007. 48(10): p. 2663-2670.

www.nepra.org.pk/polocies/hydelpotentialin pakistan.pdf.html accessed on 12th August, 2014

Xiaohui Yuana et al, P., “An Enhanced Differential Evolution Algorithm for DAILY Optimal Hydro Generation SCHEDULING”, Science Direct Journal, 2008

Xin-Ming Zhang et al, “Self-Optimization Simulation Model of Short-Term Cascaded Hydroelectric System Dispatching Based on the Daily Load Curve, Water Resources Management”, December 2013, Volume 27, Issue 15, pp 5045-5067

Ramesh Et. Al, “Simulation of Multiple Hydropower Reservoir Operations Using System Dynamics Approach”, Water Resources Management May 2014, Volume 28, Issue 7, pp. 1937-1958

Thomas et al, “ Markov State Model for Optimization of Maintenance and Renewal of Hydro Power Components”, 9th International Conference on Probabilistic Methods Applied to Power Systems, KTH, Stockholm, Sweden, 2008.

J. P. S. Catala˜o et al,” Nonlinear optimization method for short-term hydro scheduling considering head-dependency”, European Transactions On Electrical Power Euro. Trans. Electr. Power, 2008

Gingold, P., The optimum size of small run-ofriver plants. International Water Power and Dam Construction, 1981. 33(11).

Fahlbush F. Optimum capacity of a run-of-river plant. Water Power Dam Construct 1983;35(3):45–8.

Bleinc C. Utilisation de micro-ordinateur pour le dimensionnement des mini-centrales hydroelectriques. Societe Hydrotechnique de France, XXe Journees de l’ Hydraulique, IV.3.1., Lyon 1989.

Papantonis DE, Andriotis G. Optimization of the size and number of turbines for a small hydropower plant. In: Proceedings, Hidroenergia 93, vol. III. Munchen, 1993. pp. 59–68.

Voros NG, Kiranoudis CT, Maroulis ZB. Shortcut design of small hydroelectric plants. Renew Energy 2000;19: pp. 545–63.

Montanari R. Criteria for the economic planning of a low power hydroelectric plant. Renew Energy 2003;28:2129–45.

Liu Y, Ye L, Benoit I, Liu X, Cheng Y, Morel G, et al. Economic performance evaluation method for hydroelectric generating units. Energy Convers Manage 2003;44: pp. 797–808.

Kaldellis JK, Vlachou DS, Korbakis G. Technoeconomic evaluation of small hydro power plants in Greece: a complete sensitivity analysis. Energy Policy 2005;33:1969–85.

A.K Roy, et al , “Preventive Maintenance Prioritization by Fuzzy logic for seamless hydropower generation”, Institute of Engineers India, 2014.

Hosseini SMH, Forouzbakhsh F, Rahimpoor M. Determination of the optimal installation capacity of small hydro-power plants through the use of technical, economic and reliability indices. Energy Policy 2005;33:1948–56.

Lopes de Almeida JPPG, Lejeune AGH, Sa Marques JAA, CunhaMC. OPAH a model for optimal design of multi-purpose smallhydropower plants. Adv Eng Softw 2006;37:236–47.

Dursun, B. and Gokcol. C., “The role of hydroelectric power and contribution of small hydropower plants for sustainable development in Turkey”, Renewable Energy, pp. 1227-1235, 2011.

Shakir, A. S. and Maqbool, N., “Remodeling of the Upper Chenab Canal: A Case Study from Pakistan”, Irrigation and Drainage, Irrig. And Drain.(2010) Published online in Wiley InterScience (www.interscience.wiley.com) DOI: 10.1002/ird.579

Boustani, F., “An Assessment of the Small Hydropower Potential of Sisakht Region of Yasuj”, World Academy of Science, Engineering and Technology 57, Amsterdam, Netherlands, pp. 452-456, 2009.

Khan, N.M., Babel MS, Tingsanchali, T., Clemente RS, Luong, H.T. (2012), Reservoir Optimization – Simulation with Sediment Evacuation Model to Minimize Irrigation Deficits, in Water Resources Management, Springer, Vol. 26, Isswell, pp. 3173-3193.

Singal, S. K. and Saini, R. P., “Analytical approach for development of correlations for cost of canal-based SHP schemes”, Renewable Energy, pp. 2549-2558, 2008 (33).

Mirza, U. K., Ahmad, N., Majeed, T. and Harijan, K., “Hydropower use in Pakistan: Past, present and future”, Renewable and Sustainable Energy Reviews, pp. 1641-1651, 2008 (12).

BING Hao et al, “Multi-Parameter Optimization Design numerical simulation and performance test mixed flow pump impeller”, Science China Technological Sciences, vol 56,, 2013

Bockman, T., Fleten, S., Juliussen, E., Langhammer, H. J. and Revdal, I., “Investment timing and optimal capacity choice for small hydropower projects”, European Journal of Operational Research, pp. 255-267, 2008 (190).

Mardambey, O., “Preliminary Potential Assessment of Small Hydropower in Lebanon”, ARISER Vol. 3 No. 3 (2007) 107-111, 2007

Andaroodi, M. R., “Standardization of civil engineering works of small high-head hydropower plants and development of an optimization tool”, Laboratory of Hydraulic Constructions (LCH), Ecole Polytechnique Fédérale de Lausanne (EPFL), Switzerland publication no. ISSN 1661-1179, 2006.

Paish, O., “Small hydropower: technology and current status”, Renewable and Sustainable Energy Reviews, pp. 537-556, 2002 (6).

Marala (UCC 0 HPP) Feasibility Study, Integrated Environment & Energy Ltd. In Association with ENTEC AG Consultants, (2004)

Chianwali (UCCL 128 HPP) Feasibility Study, Integrated Environment & Energy Ltd. In Association with ENTEC AG Consultants, (2004)

Deg Outfall (UCCL 283 HPP) Feasibility Study, Integrated Environment & Energy Ltd. In Association with ENTEC AG Consultants, (2004)

Power Machine Groups LMZ Russia, Manufacturers Booklet, 1857, (publishing year 2010)

www.turbnpro.com accessed on 25 July 2013.

Pakistan Economic Survey 2013-2014, Finance Division, Government of Pakistan, page-88






Copyright (c) 2016 M. Mohsin Munir

Powered By KICS